Differences between revisions 2 and 10 (spanning 8 versions)
Revision 2 as of 2023-05-17 15:22:28
Size: 328
Editor: miyoki
Comment:
Revision 10 as of 2023-05-26 08:27:26
Size: 869
Editor: satoru.ikeda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
 *Alignment works Manual  *[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14969 | Alignment works Manual ]]
  *In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
   *Kamioka Control Room: on a whiteboard on the right wall side.
   *NaoJ Control Room: ?? (Takahashi-san will put)

 * MEDM to assist operator work
  * Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR[
Line 6: Line 12:
 *If an Expert needs to enter the KAGRA site.  *If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
  • Alignment works Manual

    • In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
      • Kamioka Control Room: on a whiteboard on the right wall side.
      • NaoJ Control Room: ?? (Takahashi-san will put)
  • MEDM to assist operator work
    • Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR[
  • Daily check items
  • If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
    • Please contact Miyoki/Uchiyama via mobile phone. If no response, please notice to Miyoki/Uchiyama by SLACK.

KAGRA/Observation/O4a/manuals (last edited 2023-06-01 09:51:10 by satoru.ikeda)