Size: 1019
Comment:
|
Size: 1023
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Line 12: | Line 11: |
*[[https://docs.google.com/spreadsheets/d/1fxHiM9l5mqzWZzgDkuos41hC7QTV-9WTAxWrIpAG-4U/edit#gid=0 | Check Items]] | *[[https://docs.google.com/spreadsheets/d/1TQFMM0KvCAYP3q0S2XqL3uUNRr2TV-RGKcAAD15iwaM/edit?usp=sharing | Check Items]] |
Alignment works Manual (NEED LINK UPDATE)
- In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
- Kamioka Control Room: on a whiteboard on the right wall side.
- NaoJ Control Room: ?? (Takahashi-san will put)
- In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
- MEDM to assist operator work (NEED CHECK)
- Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR]
- Daily check items
Operators Work Tips (NEED UPDATE)
- If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
- Please contact Miyoki/Uchiyama via mobile phone. If no response, please notice to Miyoki/Uchiyama by SLACK.