Differences between revisions 9 and 10
Revision 9 as of 2025-06-06 18:28:12
Size: 1097
Editor: miyoki
Comment:
Revision 10 as of 2025-06-12 11:39:27
Size: 1093
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
  *In the control room (also in NAOJ), you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
   *Kamioka Control Room: on a whiteboard on the right wall side.
  *In the control room, you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
   *Kamioka Control Room: on the distribution board in the control room.
Line 6: Line 6:
 * MEDM to assist operator work (NEED CHECK)
  * Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR]
/* * MEDM to assist operator work (NEED CHECK)
/* * Open OPERATOR.adl:[sitemap]-[Commissioning]-[Commissioning Dock]-[OPERATOR]
  • Shift Manual

    • In the control room, you can find an A4 printed sheet that contains access information on Miyoki, Uchiyama, Miyakawa, Ushiba, Kimura and R.takahashi.
      • Kamioka Control Room: on the distribution board in the control room.
      • NaoJ Control Room: ?? (Takahashi-san will put)

  • Daily check items
  • Operators Work Tips (NEED UPDATE)

  • If an Expert (+ KAGRA Site staff at the entrance if necessary) needs to enter the KAGRA site.
    • Please contact Miyoki/Uchiyama via mobile phone. If no response, please notice to Miyoki/Uchiyama by SLACK.
  • Submit observaton summary to k-log. Reference

KAGRA/Observation/O4c/manuals (last edited 2025-06-12 11:45:27 by takafumi.ushiba)