Differences between revisions 6 and 7
Revision 6 as of 2016-02-04 10:00:19
Size: 801
Comment:
Revision 7 as of 2016-02-04 10:01:06
Size: 885
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 * Check glitch rate (prepare a script?)
 * Check noise lines (prepare a script?)

IFO Operation Manual

PSL

Lock PMC

  • Prepare Guardian
  • Prepare StripTool (list of check channels)

IMC

Lock IMC

  • Check MCI, MCO and MCE (link to VIS page)
  • Put Guardian usage here
  • Prepare StripTool (list of check channels)

Main IFO

Check VIS

  • Check PR3, BS, IX and IY (link to VIS page)

Initial Alignment

  • Establish the alignment procedure
  • Make the initial alignment script
  • Put the script usage

Lock Michelson IFO

  • Establish the lock procedure
  • Prepare Guardian and put the manual here
  • Prepare StripTool (list of check channels)

Check DAQ

  • Check if the GW channel is properly recorded in the frames
  • Check glitch rate (prepare a script?)
  • Check noise lines (prepare a script?)

In the case of IFO/susbsystem failure or emergency

KAGRA/Observation/iKAGRA/Manual/MIF (last edited 2016-03-25 10:56:26 by YutaMichimura)