Differences between revisions 26 and 35 (spanning 9 versions)
Revision 26 as of 2019-12-02 00:32:49
Size: 779
Editor: miyoki
Comment:
Revision 35 as of 2019-12-02 00:56:35
Size: 1731
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
 1. IFO Alignment  * Mirror Alignment
  1. FPMI
Line 19: Line 20:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Operation/Manuals/MIF/IFO_Alignment| IR/GR beam alignment from MMT2/SR3 to ETMXY]]   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Operation/Manuals/MIF/IFO_Alignment| IR/GR beam alignment from MMT2/SR3 to ETMXY]]
  * PRFPMI
  * Alignment for IFI
  * Alignment for IMMT1/2
Line 21: Line 25:
 * GR/IR Phase Lock
 * ISS control
 *
 * Controls
  * CARM (One Arm) control
  * DARM (MICH) control
  * FPMI
  * ALS control
  * GR/IR Phase Lock
  * ISS control
  * ASC control

 * Optical Parts
  * REFL PD adjustment
  * REFL QPD adjustment
  * ASC PD adjustment
  * ASC QPD adjustment
  * ALS PD adjustment
  * Picomotors
  * Wave Plate Rotators
  * Phase Lock Heaters
  
Line 26: Line 46:
== VIS related == == VIS/CRY suspension related ==
Line 28: Line 48:
 1. Type A control
 * Type B control
 * Type BP control
 * Type Control
 1. Controls
  *
Type A control
  * Type B control
  * Type BP control
  * Type control
  * Sensor Correction
Control
 * Suspension Monitors
Line 39: Line 62:
 * OMC Alignment
Line 46: Line 70:
 * Optical Parts
  * TMS PD adjustment
  *TMS QPD adjustment
Line 50: Line 77:

-----
== CAL related ==
-----

-----
== FCL related ==
-----
 1. PSL room
  * KOACH operation
  * Precision Coolers
 * KOACHs for (IE)TM(XY) Cryostat Clean Booth
 * FFUs
  *PR/BS/EMC/SR area clean booth
  *(IE)TM(XY) Cryostat clean booth
  *(IE)(XY)A clean booth
  *(IE)(XY)V clean booth
 * Water Coolers in the Corner Station
 * Heaters
  * Corner Station
  * Y end

Manual for Commissioning


Basic


  1. PC environment

  2. Basic Tools
    • sitemap
    • dataviewer
    • medm
    • diaggui



  • Mirror Alignment
    1. FPMI
    2. PRFPMI
    3. Alignment for IFI
    4. Alignment for IMMT1/2
  • Controls
    • CARM (One Arm) control
    • DARM (MICH) control
    • FPMI
    • ALS control
    • GR/IR Phase Lock
    • ISS control
    • ASC control
  • Optical Parts
    • REFL PD adjustment
    • REFL QPD adjustment
    • ASC PD adjustment
    • ASC QPD adjustment
    • ALS PD adjustment
    • Picomotors
    • Wave Plate Rotators
    • Phase Lock Heaters



  1. Controls
    • Type A control
    • Type B control
    • Type BP control
    • Type control
    • Sensor Correction Control
  2. Suspension Monitors



  1. Laser
  2. IMC Alignment
  3. IMC control
  4. OMC Alignment
  5. OMC control



  1. OPLEV
  2. TMSX/Y
  3. Optical Parts
    • TMS PD adjustment
    • TMS QPD adjustment







  1. PSL room
    • KOACH operation
    • Precision Coolers
  2. KOACHs for (IE)TM(XY) Cryostat Clean Booth
  3. FFUs
    • PR/BS/EMC/SR area clean booth
    • (IE)TM(XY) Cryostat clean booth
    • (IE)(XY)A clean booth
    • (IE)(XY)V clean booth
  4. Water Coolers in the Corner Station
  5. Heaters
    • Corner Station
    • Y end

KAGRA/Operation/Manuals (last edited 2019-12-25 13:53:46 by miyoki)