Differences between revisions 34 and 35
Revision 34 as of 2019-12-02 00:55:34
Size: 1678
Editor: miyoki
Comment:
Revision 35 as of 2019-12-02 00:56:35
Size: 1731
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 94: Line 94:
 * Water Coolers  * Water Coolers in the Corner Station
Line 96: Line 96:
  * Corner Station
  * Y end

Manual for Commissioning


Basic


  1. PC environment

  2. Basic Tools
    • sitemap
    • dataviewer
    • medm
    • diaggui



  • Mirror Alignment
    1. FPMI
    2. PRFPMI
    3. Alignment for IFI
    4. Alignment for IMMT1/2
  • Controls
    • CARM (One Arm) control
    • DARM (MICH) control
    • FPMI
    • ALS control
    • GR/IR Phase Lock
    • ISS control
    • ASC control
  • Optical Parts
    • REFL PD adjustment
    • REFL QPD adjustment
    • ASC PD adjustment
    • ASC QPD adjustment
    • ALS PD adjustment
    • Picomotors
    • Wave Plate Rotators
    • Phase Lock Heaters



  1. Controls
    • Type A control
    • Type B control
    • Type BP control
    • Type control
    • Sensor Correction Control
  2. Suspension Monitors



  1. Laser
  2. IMC Alignment
  3. IMC control
  4. OMC Alignment
  5. OMC control



  1. OPLEV
  2. TMSX/Y
  3. Optical Parts
    • TMS PD adjustment
    • TMS QPD adjustment







  1. PSL room
    • KOACH operation
    • Precision Coolers
  2. KOACHs for (IE)TM(XY) Cryostat Clean Booth
  3. FFUs
    • PR/BS/EMC/SR area clean booth
    • (IE)TM(XY) Cryostat clean booth
    • (IE)(XY)A clean booth
    • (IE)(XY)V clean booth
  4. Water Coolers in the Corner Station
  5. Heaters
    • Corner Station
    • Y end

KAGRA/Operation/Manuals (last edited 2019-12-25 13:53:46 by miyoki)