Differences between revisions 46 and 47
Revision 46 as of 2019-12-04 07:40:06
Size: 2332
Editor: miyoki
Comment:
Revision 47 as of 2019-12-08 12:05:01
Size: 2435
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5910 |Realtime Model]

Manual for Commissioning


Basic


  1. PC environment

  2. Basic Tools



  • How to make connection btw AD/DA channel with internal channel.
  • Whitening, Dewhitening filters setting.



  • Mirror Alignment
    1. FPMI
    2. PRFPMI
    3. Alignment for IFI
    4. Alignment for IMMT1/2
  • Controls
    • CARM (One Arm) control
    • DARM (MICH) control
    • FPMI
    • ALS control
    • GR/IR Phase Lock
    • ISS control
    • ASC control
  • Optical Parts
    • REFL PD adjustment
    • REFL QPD adjustment
    • ASC PD adjustment
    • ASC QPD adjustment
    • ALS PD adjustment
    • Picomotors
    • Wave Plate Rotators
    • Phase Lock Heaters



  1. Controls
    • Type A with Cryo-suspension
    • Type B
    • Type BP
    • Type C
    • Sensor Correction
  2. Suspension State Monitors



  1. Laser
    • Controls
    • IMC control
    • OMC control
  2. Alignment
    • IMC Alignment
    • OMC Alignment
  3. Optical Parts
    • IMC PD
    • IMC QPD
    • OMC PD

    • Picomotors
    • Phase Lock Heaters



  1. OPLEV
  2. TMSX/Y
  3. Optical Parts
    • TMS PD adjustment
    • TMS QPD adjustment







  1. PSL room
  2. KOACHs for (IE)TM(XY) Cryostat Clean Booth
  3. FFUs
    • PR/BS/EMC/SR area clean booth
    • (IE)TM(XY) Cryostat clean booth
    • (IE)(XY)A clean booth
    • (IE)(XY)V clean booth
  4. Water Coolers in the Corner Station
  5. Heaters
    • Corner Station
    • Y end

KAGRA/Operation/Manuals (last edited 2019-12-25 13:53:46 by miyoki)