Differences between revisions 75 and 76
Revision 75 as of 2019-12-17 15:24:17
Size: 3789
Editor: miyoki
Comment:
Revision 76 as of 2019-12-19 09:06:53
Size: 3911
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 29: Line 29:
   a. [[KAGRA/Operation/Manuals/MIF/IFO_Alignment| IR/GR beam alignment from MMT2/SR3 to ETMXY]]    a. [[KAGRA/Operation/Manuals/MIF/oplevQPDrecovery |Action if the TMSX(Y)-IR(GR) shows jumping drop after relocking ]]
   *
[[KAGRA/Operation/Manuals/MIF/IFO_Alignment| IR/GR beam alignment from MMT2/SR3 to ETMXY]]

Manual for Commissioning


Basic


  1. PC environment

  2. Basic Tools



  • How to make connection btw AD/DA channel with internal channel.
  • Whitening, Dewhitening filters setting.





  1. Monitors
  2. Controls
  3. Suspension State Monitors



  1. Laser
    • Controls
    • IMC control
    • OMC control
  2. Alignment
    • IMC Alignment
    • OMC Alignment
  3. Optical Parts
    • IMC PD
    • IMC QPD
    • OMC PD

    • Picomotors
    • Phase Lock Heaters



  1. OPLEV
  2. TMSX/Y
  3. Optical Parts
    • TMS PD adjustment
    • TMS QPD adjustment









  1. PSL room
  2. KOACHs for (IE)TM(XY) Cryostat Clean Booth
  3. FFUs
    • PR/BS/EMC/SR area clean booth
    • (IE)TM(XY) Cryostat clean booth
    • (IE)(XY)A clean booth
    • (IE)(XY)V clean booth
  4. Water Coolers in the Corner Station

  5. Heaters
    • Corner Station
    • Y end

KAGRA/Operation/Manuals (last edited 2019-12-25 13:53:46 by miyoki)