------ EYC Recovery(20240407) ------ * Suspension health check (Takahashi, Ushiba) * A01: Cable check * * A02 Porality Check * * A03 Rubbing Check * * A04: Range and Calibration * * A05: Watchdog Setting: Skip * A06: Height Measurement * * A08: Calibration:skip * A09: Spectrum(spectra of IM/MN photosensors.) * * A10: Transfer Function * * Oplev Check (Yokozawa, Akutsu) * * Green flash at REFL and Trans PD * * Y-Pcal homeworks * *Windows Cleaning * * Tcam (Yokozawa and ChenDan, and Yamamoto) * * TMSY optical system (Akutsu and his selected persons) * Baffle PDs (Yokozawa and his selected persons): * * NAB, WAB (Akutsu) * * Vacuum system (Kimura-san / Uchiyama-kun and their selected persons) * tie rod adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down. * Nasty air parts were replaced. * Vacuum alert recovery after pumping down. * GV interlock will be tried after pumping down. * The broken cc-10 was replaced. * N2 purge is necessary for EXV. * Cryo-system (Kimura-san and his selected persons) * All temp signals are obtained? * Connector change is required for the heat link suspensions. * Cryocon alert to slack after cooling. * No interlock for TMP around the Cryostat.