Line 6: Line 6:
   *    * Re-cabling of BF damper
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28993
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29177
Line 8: Line 10:
   *    * Magnet gluing
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28831
Line 10: Line 13:
   *    * judge by the transfer functions
Line 15: Line 18:
   *    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29064
Line 18: Line 21:
   *    * ITMY IM/MN photosensors: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29140
   * ITMY tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29141
     * Moving peaks exist, but amplitudes are not so high and frequency is far from controls. -> accept
     * 2nd and 3rd graph shows it can be removed when evacuated. -> accept, we should check it after the pump down.
Line 20: Line 26:
   *    * Transsfer function : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29138
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087
    * F0 is close to edge, so gain is high. -> accept
    * F1 is within the range enough, we have no explanation why gain is so high. The reason of dip of 8Hz depends on coupling, earthquake might change the coupling. -> accept???
Line 22: Line 31:
  *    * path check: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29098
Line 25: Line 34:
 * X-Pcal homeworks
  *
Line 29: Line 36:
  *    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29128
Line 33: Line 40:

 * TMSX optical system (Akutsu and his selected persons)
Line 40: Line 45:
  *    * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984
Line 43: Line 49:
  * tie rod adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
Line 47: Line 52:
  * The broken cc-10 was replaced.
* N2 purge is necessary for EXV.
  * N2 purge is necessary for IYV.
Line 52: Line 56:
  * Connector change is required for the heat link suspensions.