Line 5: Line 5:
  * A01: Cable check   * A01: Cable check -> accept
Line 9: Line 9:
  * A02 Porality Check   * A02 Porality Check -> accept
Line 12: Line 12:
   * According to Ushiba-kun's picture, they show that all the poraries are correct -> accept
Line 17: Line 18:

---- /!\ '''Edit conflict - other version:''' ----
  * A06: Height Measurement -> accept
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29064
  * A08: Calibration:skip
  * A09: Spectrum(spectra of IM/MN photosensors.) -> accept
   * ITMY IM/MN photosensors: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29140
   * ITMY tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29141
     * Moving peaks exist, but amplitudes are not so high and frequency is far from controls. -> accept
     * 2nd and 3rd graph shows it can be removed when evacuated. -> accept, we should check it after the pump down.
  * A10: Transfer Function -> accept
   * Transsfer function : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29138
    * F0 is close to the edge, so the gain is high. -> accept
    * F1 is within the range enough, we have no explanation for why the gain is so high. The reason for the dip of 8Hz depends on coupling, the earthquake might change the coupling. 1.6Hz peak showed in the new data, but we do not know why. However, no control is applied, so -> accept
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087 -> accept
    
 * Oplev Check (Yokozawa, Akutsu) -> accept
   * path check: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29098
 * Green flash at REFL and Trans PD : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29135
  * Flash was seen -> accept

 *Windows Cleaning -> accept
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29128

---- /!\ '''Edit conflict - your version:''' ----
Line 23: Line 49:
     * Moving peaks exist, but amplitudes are not so high and frequency is far from controls. -> accept
     * 2nd and 3rd graph shows it can be removed when evacuated. -> accept, we should check it after the pump down.
Line 28: Line 52:
    * F0 is close to the edge, so the gain is high. -> accept
    * F1 is within the range enough, we have no explanation for why the gain is so high. The reason for the dip of 8Hz depends on coupling, the earthquake might change the coupling. 1.6Hz peak showed in the new data, but we do not know why. However, no control is applied, so -> accept
Line 38: Line 60:
---- /!\ '''End of edit conflict''' ----
Line 45: Line 69:

---- /!\ '''Edit conflict - other version:''' ----
   * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998 -> accept
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984 -> accept

-------
 * There were some discussions written in each item, but all items were accepted.
-------

---- /!\ '''Edit conflict - your version:''' ----
Line 47: Line 81:

---- /!\ '''End of edit conflict''' ----


IYC Recovery(20240407)



/!\ Edit conflict - other version:



/!\ Edit conflict - your version:



/!\ End of edit conflict


  • Tcam (Yokozawa and ChenDan, and Yamamoto)

  • Baffle PDs (Yokozawa and his selected persons):
  • NAB, WAB (Akutsu)


/!\ Edit conflict - other version:



  • There were some discussions written in each item, but all items were accepted.



/!\ Edit conflict - your version:



/!\ End of edit conflict


  • Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
    • Nasty air parts were replaced.
    • Vacuum alert recovery after pumping down.
    • GV interlock will be tried after pumping down.
    • N2 purge is necessary for IYV.
  • Cryo-system (Kimura-san and his selected persons)
    • All temp signals are obtained?
    • Cryocon alert to slack after cooling.
    • No interlock for TMP around the Cryostat.

KAGRA/Recovery2024/IYC (last edited 2024-04-15 12:31:12 by TakashiUchiyama)