Differences between revisions 19 and 22 (spanning 3 versions)
Revision 19 as of 2024-04-12 16:00:05
Size: 2602
Comment:
Revision 22 as of 2024-04-12 16:11:16
Size: 2775
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
  * A02 Porality Check   * A02 Porality Check -> accept
Line 26: Line 26:
  * A10: Transfer Function   * A10: Transfer Function -> accept
Line 30: Line 30:
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087    * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087 -> accept
Line 32: Line 32:
 * Oplev Check (Yokozawa, Akutsu)  * Oplev Check (Yokozawa, Akutsu) -> accept
Line 37: Line 37:
 *Windows Cleaning  *Windows Cleaning -> accept
Line 47: Line 47:
   * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984
   * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998 -> accept
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984 -> accept

-------
 * There were some discussions written in each item, but all items were accepted.
-------


IYC Recovery(20240407)



  • There were some discussions written in each item, but all items were accepted.


  • Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
    • Nasty air parts were replaced.
    • Vacuum alert recovery after pumping down.
    • GV interlock will be tried after pumping down.
    • N2 purge is necessary for IYV.
  • Cryo-system (Kimura-san and his selected persons)
    • All temp signals are obtained?
    • Cryocon alert to slack after cooling.
    • No interlock for TMP around the Cryostat.