Differences between revisions 2 and 15 (spanning 13 versions)
Revision 2 as of 2024-04-09 09:47:22
Size: 1292
Editor: miyoki
Comment:
Revision 15 as of 2024-04-12 15:51:22
Size: 2406
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
   *    * Re-cabling of BF damper
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28993
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29177
Line 8: Line 10:
   *    * Magnet gluing
   * https://klog.icrr.u-tokyo.ac.jp/osl/?r=28831
Line 10: Line 13:
   *    * judge by the transfer functions
Line 15: Line 18:
   *    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29064
Line 18: Line 21:
   *    * ITMY IM/MN photosensors: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29140
   * ITMY tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29141
     * Moving peaks exist, but amplitudes are not so high and frequency is far from controls. -> accept
     * 2nd and 3rd graph shows it can be removed when evacuated. -> accept, we should check it after the pump down.
Line 20: Line 26:
   *    * Transsfer function : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29138
    * F0 is close to the edge, so the gain is high. -> accept
    * F1 is within the range enough, we have no explanation for why the gain is so high. The reason for the dip of 8Hz depends on coupling, the earthquake might change the coupling. 1.6Hz peak showed in the new data, but we do not know why. However, no control is applied, so -> accept
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087
    
Line 22: Line 32:
  *    * path check: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29098
Line 27: Line 37:
  *    * https://klog.icrr.u-tokyo.ac.jp/osl/?r=29128
Line 36: Line 46:
  *    * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984
Line 39: Line 50:
  * tie rod adjustment between EXC and TMSX to avoid stress when the only EXC side is pumped down.
Line 43: Line 53:
  * The broken cc-10 was replaced.
* N2 purge is necessary for EXV.
  * N2 purge is necessary for IYV.
Line 48: Line 57:
  * Connector change is required for the heat link suspensions.


IYC Recovery(20240407)


KAGRA/Recovery2024/IYC (last edited 2024-04-15 12:31:12 by TakashiUchiyama)