Differences between revisions 9 and 22 (spanning 13 versions)
Revision 9 as of 2024-04-12 15:27:28
Size: 1918
Comment:
Revision 22 as of 2024-04-12 16:11:16
Size: 2775
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
  * A01: Cable check   * A01: Cable check -> accept
Line 9: Line 9:
  * A02 Porality Check   * A02 Porality Check -> accept
Line 12: Line 12:
   * According to Ushiba-kun's picture, they show that all the poraries are correct -> accept
Line 17: Line 18:
  * A06: Height Measurement   * A06: Height Measurement -> accept
Line 20: Line 21:
  * A09: Spectrum(spectra of IM/MN photosensors.)   * A09: Spectrum(spectra of IM/MN photosensors.) -> accept
Line 22: Line 23:
   * ITMY tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29141 -> moving peaks exist, but amplitudes are not so high and frequency is far from controls.
  * A10: Transfer Function
   * ITMY tower sensor: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29141
     * Moving peaks exist, but amplitudes are not so high and frequency is far from controls. -> accept
     * 2nd and 3rd graph shows it can be removed when evacuated. -> accept, we should check it after the pump down.
  * A10: Transfer Function -> accept
Line 25: Line 28:
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087
 * Oplev Check (Yokozawa, Akutsu)
    * F0 is close to the edge, so the gain is high. -> accept
    * F1 is within the range enough, we have no explanation for why the gain is so high. The reason for the dip of 8Hz depends on coupling, the earthquake might change the coupling. 1.6Hz peak showed in the new data, but we do not know why. However, no control is applied, so -> accept
   * EQ stop: https://klog.icrr.u-tokyo.ac.jp/osl/?r=29087 -> accept
    
 * Oplev Check (Yokozawa, Akutsu) -> accept
Line 28: Line 34:
 * Green flash at REFL and Trans PD
  *
 * Green flash at REFL and Trans PD : https://klog.icrr.u-tokyo.ac.jp/osl/?r=29135
  * Flash was seen -> accept
Line 31: Line 37:
 *Windows Cleaning  *Windows Cleaning -> accept
Line 41: Line 47:
   * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984
   * NAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28998 -> accept
   * WAB: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28984 -> accept

-------
 * There were some discussions written in each item, but all items were accepted.
-------


IYC Recovery(20240407)



  • There were some discussions written in each item, but all items were accepted.


  • Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
    • Nasty air parts were replaced.
    • Vacuum alert recovery after pumping down.
    • GV interlock will be tried after pumping down.
    • N2 purge is necessary for IYV.
  • Cryo-system (Kimura-san and his selected persons)
    • All temp signals are obtained?
    • Cryocon alert to slack after cooling.
    • No interlock for TMP around the Cryostat.

KAGRA/Recovery2024/IYC (last edited 2024-04-15 12:31:12 by TakashiUchiyama)