TMSY recovery * Inspection after the earthquakes * no damage by eyeballs check: https://klog.icrr.u-tokyo.ac.jp/osl/?r=28870 * slight stain-like material on a mirror for GR. * Some metal-like dusts found at the bottom of the table structure (Fig. 3); we just wiped them. * Beam alignment in the EYT tank: https://klog.icrr.u-tokyo.ac.jp/osl/?r=30142 * beam path: impossible to check at the wide beam position -> GR was checked -> OK. * clipping (beam position on mirrors) at the output optics? -> Ok in-vac, but clipped at the in-air steering mirror position. * Beam alignment in the optical table outside the EYT tank (After opening GV between EYT/C, we need to check again.): https://klog.icrr.u-tokyo.ac.jp/osl/?r=30147 * Beam positions on mirrors and PDs/QPDs: In the case of GR, clipping was found(https://klog.icrr.u-tokyo.ac.jp/osl/?r=30145) and adjusted -> OK, Others were adjusted. * PDs gain adjustment: done after * Stray light dumping: Not checked seriously -> done after * FFU operation status check: All are operated. * closing tube status check between EYT and TMSY table: closed properly ?? * EYT vacuum tank * Air leak for GV: repaired. https://klog.icrr.u-tokyo.ac.jp/osl/?r=28857 * cleaning outside the vacuum tank: On Feb 7th:https://klog.icrr.u-tokyo.ac.jp/osl/?r=28542, * cleaning inside * gasket selection * FFU operation status check * tierod adjustment at GV between EYT and EYC tank * Vacuum alert: Deactive(https://klog.icrr.u-tokyo.ac.jp/osl/?r=28517), Active()