Differences between revisions 2 and 3
Revision 2 as of 2024-04-06 07:33:18
Size: 9255
Editor: miyoki
Comment:
Revision 3 as of 2024-04-06 07:33:42
Size: 9258
Editor: miyoki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
KAGRA/Recove------ KAGRA/Recover
------

KAGRA/Recover


IMC recovery(20240322)



one of templates for IMC closing by Akutsu-kun in 2021.


Summary


  • TF of MCe had a shift of peak frequency on the pitch. Ushiba-kun will measure it again with the well-centered oplev. It will be reported at the recovery meeting or later.
  • All others should be OK for closing IMC chambers.
    • The resistance of the Coil of MCo H4 looked high. Washimi-kun will measure it again on Monday, but it won't stop closing anyway.
    • Washimi-kun will measure inductances again on Monday.
    • Check no dust inside, especially on the bottom before closing.
    • Check the leak points are fastened tightly when closing.


X-Pcal Recovery(20240402)


  • Dan's presentation files

    • Path2 drift is concerns. However, we expect we can compensate for the drift by using pico-mirrors.
    • 5% power loss is concerned. It should be checked on 3~4 April. --> klog#29065

    • Pcal-X noise in the Cal line is OK? --> klog#29075


EXC Recovery(20240404)



*** Recovery(202404??)



*** Recovery(202404??)


ry2024について、ここに記述してください。

KAGRA/Recovery2024 (last edited 2024-04-27 07:53:00 by miyoki)