Line 6: Line 6:
      * Brief Overview of Noise Subtraction Activities       * '''Brief''' Overview of Noise Subtraction Activities
Line 9: Line 9:
        * Activities at KAGRA
          * who, what, '''features''', current status, future plan?
            * !DeepClean
              * Ref.: https://journals.aps.org/prresearch/abstract/10.1103/PhysRevResearch.2.033066
              * Low-Latency and Offline Deployment
            * ICA (Independent Component Analysis)
            * Other ongoing initiatives?
              * Has each research unit or search pipeline been developing noise subtraction optimized for their specific needs?
            * Example of NonSENS subtraction at H1, November 2nd, 2024: https://ldas-jobs.ligo-wa.caltech.edu/~detchar/summary/day/20241102/cal/nonsens/#gallery-9
        * Activities at KAGRA ( Who?, Project name?, '''**Features?(What can and what can't be done?)**''', Current status?, Future plan?)
            * Algorithm
              * Liner ICA (Independent Component Analysis)
                * Yokoyama & Kume (RESCEU), Itoh & Kobayashi (OMU)
                * Ref.: https://doi.org/10.1093/ptep/ptaa056
                * ..
              * Non-liner ICA
                * Yokoyama & Kume (RESCEU)
              * !DeepClean (CNN)
                * Yi, Chou, Yeh (NYCU, NTHU)
                * Ref.: https://journals.aps.org/prresearch/abstract/10.1103/PhysRevResearch.2.033066
                * Low-Latency and Offline Deployment
                * KAGRA F2F Summer 2024 Slides: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15977
                * ..
              * LSTM
                * Takatani (OMU)
              * PINN (Physics-informed neural network)
                * !DanChen & Sakemi
                * JPS 2023 Autumn [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15075|JGW-G2315075]]
                * JPS 2024 Spring [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15603|JGW-G2415603]]
              * Other ongoing initiatives?
                * Has each research unit or search pipeline been developing noise subtraction optimized for their specific needs?

            * Target noises & Witness channels
                * AC power 60 Hz and its harmonics
                * Acoustic noise (PSL, IFI, OMC, ...)
                * Other Dofs (CARM, MICH, PRCL)
                * ASC
                * Beam jitter (IMMT1 trans QPD)

            * Computers and Pipelines
               * GPU for offline !DeepClean @ Taiwan
               * GPU for online !DeepClean @ Kamioka
               * Kashiwa KMST
               * RESCEU

Line 22: Line 52:
            * NonSENS codebase: https://git.ligo.org/gabriele-vajente/nonsens/-/tree/master/nonsens
            * Running online (in the front-end) at LHO/LLO
            * Codebase: https://git.ligo.org/gabriele-vajente/nonsens
            * Running online at LHO/LLO
Line 27: Line 57:
              * The output channel is available in the control room, for use with commissioning, and is the same channel that analysis pipelines will use.               * The output channels are available in the control rooms, for use with commissioning, and are the same channels that analysis pipelines will use.
Line 29: Line 59:
      * Scope '''of the group''' to be established       * Scope '''of the Group''' to be established
Line 32: Line 62:
          * Will it encompass all noise subtraction-related activities at KAGRA?
          * Will it focus specifically on areas that contribute to the commissioning timeline, i.e., ''low-'' or ''middle-latency''?
          * Will the group encompass all noise subtraction-related activities at KAGRA? (ICA+!DeepClean+...)
          * Will the group focus specifically on areas that contribute to the commissioning timeline, i.e., ''low-'' or ''middle-latency''?
          * or...
Line 35: Line 66:
          * during the commissioning period prior to participating in O4b observation
          * during the O4b observation
          * for future phases O5/O6
          * During the commissioning period prior to participating in O4b observation
          * During the O4b observation
            * Q: Will the cleaned h(t) produced by this team be used as an official deliverable and released to the public?!
          * F
or future phases O5/O6
Line 45: Line 77:
    * NOTE: The following terms mean completely different things. Please use them correctly when discussing.
      * -- safe channel, witness channel, auxiliary channel, ...
      * -- online(front-end), low-latency, middle-latency, high-latency(offline)

      * Safe channel, Witness channel, Auxiliary channel, ...
      * Online(front-end), Low-latency, Middle-latency, High-latency, (offline), ...

Noise Subtraction subgroup

  • Pre-meeting
    • Date/Time: Tuesday, November 5th, 2024, 1600-1800 JST (0700-0900 UTC)
    • Connection Info.: Zoom1
    • Agenda
      • Brief Overview of Noise Subtraction Activities

      • Scope of the Group to be established

        • Organization?
          • Chia-Jui Chou from Natl. Yang Ming Chiao Tung U. will lead the group as the chief.
          • Will the group encompass all noise subtraction-related activities at KAGRA? (ICA+DeepClean+...)

          • Will the group focus specifically on areas that contribute to the commissioning timeline, i.e., low- or middle-latency?

          • or...
        • Roles/Goals for each phase
          • During the commissioning period prior to participating in O4b observation
          • During the O4b observation
            • Q: Will the cleaned h(t) produced by this team be used as an official deliverable and released to the public?!
          • For future phases O5/O6
        • How collaborate with on-site commissioners/IFO experts?
          • e.g.,
            • Commissioners may request specific noise subtraction, such as subtracting noise in channel-A using auxiliary channel-B?

            • Commissioners may manage a safe channel list?
            • ...
          • What considerations should guide us as we progress? How should we work with the team?
      • Safe channel, Witness channel, Auxiliary channel, ...
      • Online(front-end), Low-latency, Middle-latency, High-latency, (offline), ...

KAGRA/SEO/NoiseSubtraction (last edited 2024-11-05 15:55:51 by tatsuki.washimi)