Line 4: Line 4:
  * Not checked yet!   * In future IOO/IOO1/no IO chassis rack
  * Rough checked(2018/07/13)
   * Final check will be done in end of August
  * Summarize the report (2018/07/13 : Shimode)
  * Summarize the problem point (2018/07/17 : Yokozawa)
  * Reprot to expert (Report to Kokeyama-san, Nakano-san)
  * B) Rack fix progress (Not finished)
  *
Line 13: Line 20:
  * B) Reprot to expert (Discuss, who?)   * Reprot to expert (Report to Shoda-san, Aso-san)
Line 15: Line 22:
  * ADC0-8, DAC1-3, DAC1-4, ADC1 for PEM?
Line 20: Line 28:
  * B) Reprot to expert (Discuss, who?)   * Reprot to expert (Report to Shoda-san, Aso-san)
Line 22: Line 30:
  * ADC0-8, DAC1-3, DAC1-4
Line 27: Line 36:
  * B) Reprot to expert (Discuss, who?)   * Reprot to expert (Report to Shoda-san, Aso-san)
Line 29: Line 38:
  * ADC0-8, DAC1-3, DAC1-4
Line 31: Line 41:
  * Not checked yet!   * Now cleaning!!!
Line 34: Line 44:
  * Not installed   * Now installing
Line 36: Line 46:
 * [[KAGRA/Subgroups/AEL/Rackcheck/IX1|IX1]]
  * Not installed
 * [[KAGRA/Subgroups/AEL/Rackcheck/IX1_1|IX1_1]]
  * Now installing

 * [[KAGRA/Subgroups/AEL/Rackch
eck/IX1_2|IX1_2]]
  * Now installing
Line 40: Line 53:
  * Not installed   * Now installing
Line 42: Line 55:
 * [[KAGRA/Subgroups/AEL/Rackcheck/IY1|IY1]]
  * Not installed
 * [[KAGRA/Subgroups/AEL/Rackcheck/IY1_1|IY1_1]]
  * Now installing

 * [[KAGRA/Subgroups/AEL/Rackch
eck/IY1_2|IY1_2]]
  * Now installing
Line 46: Line 62:
  * Not checked yet!(Not finish the cabling?? )   * Now installing
Line 49: Line 65:
  * Not checked yet!(Not finish the cabling?? )   * Now installing
Line 52: Line 68:
  * Not installed   * Now installing
Line 61: Line 77:
  * Not installed   * Now installing
Line 67: Line 83:
  * Not checked yet!   * Checked(2018/06/07)
  * Summarize the report (2018/06/08 : Shimode)
  * Summarize the problem point (2018/06/10 : Yokozawa)
  * B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)
  * B) Rack fix progress (Not finished)
Line 70: Line 90:
  * Not checked yet!   * Checked(2018/06/07)
  * Summarize the report (2018/06/08 : Shimode)
  * Summarize the problem point (2018/06/10 : Yokozawa)
  * B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)
  * B) Rack fix progress (Not finished)
Line 73: Line 97:
  * Not checked yet!   * Checked(2018/06/07)
  * Summarize the report (2018/06/08 : Shimode)
  * Summarize the problem point (2018/06/10 : Yokozawa)
  * B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)
  * B) Rack fix progress (Not finished)
Line 76: Line 104:
  * Not checked yet!   * Checked(2018/06/07)
  * Summarize the report (2018/06/08 : Shimode)
  * Summarize the problem point (2018/06/10 : Yokozawa)
  * B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)
  * B) Rack fix progress (Not finished)
Line 102: Line 134:
  * B) Summarize the problem point (ONGOING : Yokozawa)
  * Reprot to expert (Discuss, who?)
  * Rack fix progress (Not finished)
  * Summarize the problem point (ONGOING : Yokozawa)
  * B) Reprot to expert (Discuss, who?)
  * B) Rack fix progress (Not finished)

List of KAGRARacks

  • IOO

    • In future IOO/IOO1/no IO chassis rack
    • Rough checked(2018/07/13)
      • Final check will be done in end of August
    • Summarize the report (2018/07/13 : Shimode)
    • Summarize the problem point (2018/07/17 : Yokozawa)
    • Reprot to expert (Report to Kokeyama-san, Nakano-san)
    • B) Rack fix progress (Not finished)

  • IMC

    • Not checked yet!
  • PR2

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4, ADC1 for PEM?
  • PR3

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • PRM

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • BS

    • Now cleaning!!!
  • IX0

    • Now installing
  • IX1_1

    • Now installing
  • IX1_2

    • Now installing
  • IY0

    • Now installing
  • IY1_1

    • Now installing
  • IY1_2

    • Now installing
  • SR2

    • Now installing
  • SR3

    • Now installing
  • SRM

    • Now installing
  • OMC

    • Not installed
  • LSC

    • Not installed
  • ASC0

    • Now installing
  • ASC1

    • Not installed
  • EX0

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_1

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_2

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_PWR

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EY0

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/07 : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • EY1_1

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_2

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_PWR

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (ONGOING : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • XARM500

    • Not checked yet!