List of KAGRARacks
- Not checked yet!
- Not checked yet!
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Not checked yet!
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!(Not finish the cabling?? )
- Not checked yet!(Not finish the cabling?? )
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/07 : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Not checked yet!