Size: 3485
Comment:
|
Size: 3530
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* B) Reprot to expert (Discuss, who?) | * B) Reprot to expert (Report to Shoda-san, Aso-san) |
Line 21: | Line 21: |
* B) Reprot to expert (Discuss, who?) | * B) Reprot to expert (Report to Shoda-san, Aso-san) |
Line 29: | Line 29: |
* B) Reprot to expert (Discuss, who?) | * B) Reprot to expert (Report to Shoda-san, Aso-san) |
List of KAGRARacks
- Not checked yet!
- Not checked yet!
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Report to Shoda-san, Aso-san)
Rack fix progress (Not finished)
- ADC0-8, DAC1-3, DAC1-4, ADC1 for PEM?
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Report to Shoda-san, Aso-san)
Rack fix progress (Not finished)
- ADC0-8, DAC1-3, DAC1-4
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Report to Shoda-san, Aso-san)
Rack fix progress (Not finished)
- ADC0-8, DAC1-3, DAC1-4
- Not checked yet!
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!(Not finish the cabling?? )
- Not checked yet!(Not finish the cabling?? )
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/07 : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
Reprot to expert (Discuss, who?)
Rack fix progress (Not finished)
- Not checked yet!