Differences between revisions 23 and 24
Revision 23 as of 2018-06-08 16:15:22
Size: 3530
Comment:
Revision 24 as of 2018-06-08 16:15:41
Size: 3521
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
  * B) Reprot to expert (Report to Shoda-san, Aso-san)   * Reprot to expert (Report to Shoda-san, Aso-san)
Line 21: Line 21:
  * B) Reprot to expert (Report to Shoda-san, Aso-san)   * Reprot to expert (Report to Shoda-san, Aso-san)
Line 29: Line 29:
  * B) Reprot to expert (Report to Shoda-san, Aso-san)   * Reprot to expert (Report to Shoda-san, Aso-san)

List of KAGRARacks

  • IOO

    • Not checked yet!
  • IMC

    • Not checked yet!
  • PR2

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4, ADC1 for PEM?
  • PR3

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • PRM

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • BS

    • Not checked yet!
  • IX0

    • Not installed
  • IX1_1

    • Not installed
  • IX1_2

    • Not installed
  • IY0

    • Not installed
  • IY1_1

    • Not installed
  • IY1_2

    • Not installed
  • SR2

    • Not checked yet!(Not finish the cabling?? )
  • SR3

    • Not checked yet!(Not finish the cabling?? )
  • SRM

    • Not installed
  • OMC

    • Not installed
  • LSC

    • Not installed
  • ASC0

    • Not installed
  • ASC1

    • Not installed
  • EX0

    • Not checked yet!
  • EX1_1

    • Not checked yet!
  • EX1_2

    • Not checked yet!
  • EX1_PWR

    • Not checked yet!
  • EY0

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/07 : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • EY1_1

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_2

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_PWR

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (ONGOING : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • XARM500

    • Not checked yet!