Differences between revisions 25 and 26
Revision 25 as of 2018-06-10 09:52:41
Size: 4521
Comment:
Revision 26 as of 2018-07-17 08:30:52
Size: 4782
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
  * Not checked yet!   * In future IOO/IOO1/no IO chassis rack
  * Rough checked(2018/07/13)
   * Final check will be done in end of August
  * Summarize the report (2018/07/13 : Shimode)
  * Summarize the problem point (2018/07/17 : Yokozawa)
  * Reprot to expert (Report to Kokeyama-san, Nakano-san)
  * B) Rack fix progress (Not finished)
  *
Line 34: Line 41:
  * Not checked yet!   * Now cleaning!!!
Line 37: Line 44:
  * Not installed   * Now installing
Line 40: Line 47:
  * Not installed   * Now installing
Line 43: Line 50:
  * Not installed   * Now installing
Line 46: Line 53:
  * Not installed   * Now installing
Line 49: Line 56:
  * Not installed   * Now installing
Line 52: Line 59:
  * Not installed   * Now installing
Line 55: Line 62:
  * Not checked yet!(Not finish the cabling?? )   * Now installing
Line 58: Line 65:
  * Not checked yet!(Not finish the cabling?? )   * Now installing
Line 61: Line 68:
  * Not installed   * Now installing
Line 70: Line 77:
  * Not installed   * Now installing

List of KAGRARacks

  • IOO

    • In future IOO/IOO1/no IO chassis rack
    • Rough checked(2018/07/13)
      • Final check will be done in end of August
    • Summarize the report (2018/07/13 : Shimode)
    • Summarize the problem point (2018/07/17 : Yokozawa)
    • Reprot to expert (Report to Kokeyama-san, Nakano-san)
    • B) Rack fix progress (Not finished)

  • IMC

    • Not checked yet!
  • PR2

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4, ADC1 for PEM?
  • PR3

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • PRM

    • Checked(2018/05/25)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/08 : Yokozawa)
    • Reprot to expert (Report to Shoda-san, Aso-san)
    • B) Rack fix progress (Not finished)

    • ADC0-8, DAC1-3, DAC1-4
  • BS

    • Now cleaning!!!
  • IX0

    • Now installing
  • IX1_1

    • Now installing
  • IX1_2

    • Now installing
  • IY0

    • Now installing
  • IY1_1

    • Now installing
  • IY1_2

    • Now installing
  • SR2

    • Now installing
  • SR3

    • Now installing
  • SRM

    • Now installing
  • OMC

    • Not installed
  • LSC

    • Not installed
  • ASC0

    • Now installing
  • ASC1

    • Not installed
  • EX0

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_1

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_2

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EX1_PWR

    • Checked(2018/06/07)
    • Summarize the report (2018/06/08 : Shimode)
    • Summarize the problem point (2018/06/10 : Yokozawa)
    • B) Reprot to expert (Report to Takahashi-san, Aso-san, Okutomi-san, Tomaru-san, Miyamoto-san?)

    • B) Rack fix progress (Not finished)

  • EY0

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (2018/06/07 : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • EY1_1

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_2

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • B) Summarize the problem point (ONGOING : Yokozawa)

    • Reprot to expert (Discuss, who?)
    • Rack fix progress (Not finished)
  • EY1_PWR

    • Checked(2018/06/01)
    • Summarize the report (2018/06/06 : Tomura)
    • Summarize the problem point (ONGOING : Yokozawa)
    • B) Reprot to expert (Discuss, who?)

    • B) Rack fix progress (Not finished)

  • XARM500

    • Not checked yet!

KAGRA/Subgroups/AEL/Rackcheck/racklist (last edited 2018-07-17 08:30:52 by TakaakiYokozawa)