Line 11: | Line 11: |
* Summarize the report(2018/06/06 : Tomura) * Summarize the problem point(ONGOING : Yokozawa) |
* Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (2018/06/08 : Yokozawa) * Reprot to expert (Discuss, who?) |
Line 16: | Line 17: |
* Checked(2018/05/25) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (2018/06/08 : Yokozawa) * B) Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 18: | Line 24: |
* Checked(2018/05/25) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (2018/06/08 : Yokozawa) * Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 19: | Line 30: |
* [[KAGRA/Subgroups/AEL/Rackcheck/BS|BS]] Not checked yet! | * [[KAGRA/Subgroups/AEL/Rackcheck/BS|BS]] * Not checked yet! |
Line 22: | Line 34: |
* Not installed | |
Line 24: | Line 37: |
* Not installed * [[KAGRA/Subgroups/AEL/Rackcheck/IY0|IY0]] * Not installed |
|
Line 26: | Line 43: |
* [[KAGRA/Subgroups/AEL/Rackcheck/IY1|IY1]] * [[KAGRA/Subgroups/AEL/Rackcheck/IY0|IY0]] * [[KAGRA/Subgroups/AEL/Rackcheck/IY1|IY1]] |
* Not installed |
Line 34: | Line 46: |
* Not checked yet!(Not finish the cabling?? ) | |
Line 36: | Line 49: |
* Not checked yet!(Not finish the cabling?? ) | |
Line 38: | Line 52: |
* Not installed | |
Line 40: | Line 55: |
* Not installed | |
Line 42: | Line 58: |
* Not installed * [[KAGRA/Subgroups/AEL/Rackcheck/ASC0|ASC0]] * Not installed |
|
Line 44: | Line 64: |
* Not installed | |
Line 46: | Line 67: |
* Not checked yet! | |
Line 48: | Line 70: |
* Not checked yet! | |
Line 50: | Line 73: |
* Not checked yet! | |
Line 52: | Line 76: |
* Not checked yet! | |
Line 54: | Line 79: |
* Checked(2018/06/01) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (ONGOING : Yokozawa) * Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 56: | Line 86: |
* Checked(2018/06/01) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (ONGOING : Yokozawa) * Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 58: | Line 93: |
* Checked(2018/06/01) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (ONGOING : Yokozawa) * Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 60: | Line 100: |
* Checked(2018/06/01) * Summarize the report (2018/06/06 : Tomura) * Summarize the problem point (ONGOING : Yokozawa) * Reprot to expert (Discuss, who?) * Rack fix progress (Not finished) |
|
Line 62: | Line 107: |
* Not checked yet! |
List of KAGRARacks
- Not checked yet!
- Not checked yet!
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
PR3 Checked, not fixed yet (2018/06/06)
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
PRM Checked, not fixed yet (2018/06/06)
- Checked(2018/05/25)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (2018/06/08 : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Not checked yet!
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!(Not finish the cabling?? )
- Not checked yet!(Not finish the cabling?? )
- Not installed
- Not installed
- Not installed
- Not installed
- Not installed
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Not checked yet!
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Checked(2018/06/01)
- Summarize the report (2018/06/06 : Tomura)
- Summarize the problem point (ONGOING : Yokozawa)
- Reprot to expert (Discuss, who?)
- Rack fix progress (Not finished)
- Not checked yet!