Differences between revisions 1 and 2
Revision 1 as of 2015-02-23 14:58:40
Size: 679
Comment:
Revision 2 as of 2015-02-23 15:32:40
Size: 798
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * VIS: LVDT driver, High power coil driver, Satellite box
 * IOO: MC servo
 * MIF: I&Q demodulator
 * MIF/GIF/AOS/DGS: Whitening filter
 * DGS: 18V DC power strip
 * VIS: LVDT driver
  a.
High power coil driver
  *
Satellite box
 * IOO:
  a.
MC servo
 * MIF:
  a.
I&Q demodulator
 * MIF/GIF/AOS/DGS:
  a.
Whitening filter
 * DGS:
  a.
18V DC power strip
Line 15: Line 21:
 * RF QPD, 12V DC power strip  * RF QPD
 *
12V DC power strip
Line 18: Line 25:
 * PMC driver
 * Low power coil driver
 * Stepper motor chassis
 * OSEM reader

2015/2/23 15:00-16:00 AEL meeting

  • 出席者: 宮川、上泉、粟井


1. 現在進んでいる回路の進捗状況

  • VIS: LVDT driver
    1. High power coil driver
    2. Satellite box
  • IOO:
    1. MC servo
  • MIF:
    1. I&Q demodulator

  • MIF/GIF/AOS/DGS:
    1. Whitening filter
  • DGS:
    1. 18V DC power strip

2. 現在サスペンドしている回路の確認

  • RF QPD
  • 12V DC power strip

3. これから提出されるであろう回路の対応について

  • PMC driver
  • Low power coil driver
  • Stepper motor chassis
  • OSEM reader

4. 検討事項及びタスクのリストアップ

  • DC電源の配電について
  • Whitening filter検査結果と対策
  • Field rackの対策

5. その他

KAGRA/Subgroups/AEL/meeting/20150223 (last edited 2015-02-23 19:15:14 by OsamuMiyakawa)