= 20181108 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6916]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6924]] == Today's activities == Workers regarding the NAB: Akutsu, Yano, Simon, K. Tanaka; regarding the PD holders installation: Enomoto, Izumi, (Akutsu) * Checked the balance of the suspended NAB after leveling the assembly frame. * Then pulled up the NAB suspension from the assembly frame, and inserted into the Inoue tower, which was already taken out from the IYA by some days ago. * Finished today's works regarding NAB by preparing slings, the crane, and the chain block to the extent we can immediately lift up the NAB suspension with the tower. * Actually we tested the required height under the chain block (揚程). * Attached PD holders, which was assembled on an AOS desk in IYC clean booth as a night shift; see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6924|here]]. == Next Plan == * Insert the whole NAB suspension into the IYA. (How to align to where??) * Do some sanity checks. * Measure the resonant frequencies and the Q-factors with laser displacement sensors?? and oplevs? == Wanted! == * Clamps...