Differences between revisions 56 and 115 (spanning 59 versions)
Revision 56 as of 2019-07-31 12:52:17
Size: 3173
Comment:
Revision 115 as of 2022-01-24 19:46:38
Size: 6587
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
Line 4: Line 3:
 * FY2012: 1 pc delivered.  * FY2012: 1 pc delivered. (Just for a test)
Line 9: Line 8:
 * Current PRM (serial?): degrading.  * 20191218: three free-exchanges are delivered: S/N 242767, 242768, 242769.
 * 20220121: one new? light source (S/N 268205) and a repaired one (S/N 203248) arrived.
Line 13: Line 13:
||        || || || ||
|| 203245 || || ||IMMT1 (Mail by Uehara-san on 20180726); degrading, halved in 7200 hours.||
|| 2032
46 || || ||IMMT2 (Mail by Uehara-san on 20180726); degrading, halved in 7200 hours.||
|| 203247 || || ||||
|| 203248
|| || ||Stocked in a box at Yend; had been used for iKAGRA-Yend. ||
|| 203249 || || ||SR2; degrading; halved in 4800 hours.||
|| '''--(203250)--''' || || ||[WAS] MCo (halved at ~8400 hours)-> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4319|Detached (20180301)]] -> Repaired one is delivered (20190411) ||
|| 203251 || || || ||
|| 203252 || || ||PR2; degrading. Halved in 7200 hours. ||
|| '''--(203253)--''' || || ||[WAS] MCi (halved at ~6000 hours) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Detached (20181212)]] -> Repaired one is delivered (20190411) ||
|| 203255 || || || EY Test Mass oplev||
|| '''--(203256)--'''|| || ||[WAS] MCe (halved at ~4800 hours??) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Detached (20181212)]] -> Repaired one is delivered (20190411) ||
|| 203258 || || ||EX Marionette oplev ||
|| 203259 || || ||BS; degrading. Halved in 10800 hours ||
|| 203262 || || ||Stocked at Mitaka (as of 20190729) ||
|| '''--(203263)--''' || || ||old PR3; detached.||
|| || || || ||
||'''--(203245)--''' || || ||IMMT1 (confirmed by Akutsu on 20190801); degrading, halved in 7200 hours. -> [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19346|Dead on 20220104]]||
||203246 || || ||PR
M (confirmed by Akutsu on 20190801); degrading, halved in 7200 hours. --> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10586|Detached (20190918)]]; but it is just halved, so|among these sources it can be still usable??? Anyway it is now '''stocked''' tetatively.||
||'''--(203247)--''' || || ||Stocked in a box at Xend; had been used for iKAGRA-Xend. (20190731 confirmed) --> '''Took it out''' to send back to the company according to our agreement (20200109)||
||203248 || || ||'''Stocked''' in a box at
Yend; had been used for iKAGRA-Yend. (20190731 confirmed) --> Took it back; to be sent to the manufacture (20210531) --> Repaired one came back (20220121)||
||203249 || || ||SR2; degrading; halved in 4800 hours. ||
||'''--(203250)--''' || || ||[Detached] MCo (halved at ~8400 hours)-> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4319|Detached (20180301)]] -> Repaired one is delivered (20190411) ||
||'''--(203251)--''' || || ||[Detached (on 20190801) and replaced] old IMMT2; degrading... ||
||'''--(203252)--''' || || ||[Detached (on 20190801) and replaced] old PR2; degrading. Halved in 7200 hours. ||
||'''--(203253)--''' || || ||[Detached] MCi (halved at ~6000 hours) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Detached (20181212)]] -> Repaired one is delivered (20190411) ||
||'''--(203255)--''' || || ||EY Test Mass oplev; suspect degrading. -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Detached and stocked in the center (20200109)]] ||
||'''--(203256)--''' || || ||[Detached] MCe (halved at ~4800 hours??) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Detached (20181212)]] -> Repaired one is delivered (20190411) ||
||'''--(203258)--''' || || ||EX Marionette oplev; suspect degrading. -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Detached and stocked in the center (20200109)]] ||
||203259 || || ||BS; degrading. Halved in 10800 hours ||
||203262 || || ||'''Stocked''' at Mitaka (as of 20190729) ||
||'''--(203263)--''' || || ||[Detached] old PR3; detached. See [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8707|here]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8706|here]] ||
Line 32: Line 33:
|| 225022 || || ||IY Test Mass oplev ||
|| 228141 || || || Stocked (20190730 confirmed)||
|| 228142 || || || Stocked (unpacked) at NAB@IYA (20190730 confirmed)||
|| 228143 || || || Stocked (20190730 confirmed)||
|| 228144 || || || Stocked (20190730); firstly I (Akutsu) happened to find it was left at the entrance of the IXC booth for some reason...||
|| 228145 || || || IX Marionette oplev ||
|| 228146 || || ||SR3; degrading. Halved in 7200 hours.||
|| 228147 || || || [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4319|Installed at MCo (20180301)]]. So far it is ok (20190718).||
|| 228148 || || ||IX Test Mass opLev||
|| 228151 || || ||EY Marionette oplev||
|| 228153 || || ||IY Marionette oplev ||
|| 228154 || || ||EX Test Mass oplev ||
|| 228155 || || || [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Installed at MCe (20181212)]]. Not so clear as that of MCi, but this is also getting degraded.||
|| 228158 || || ||SRM; degrading. Halved in 7200 hours.||
|| 228160 || || || [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Installed at MCi (20181212)]]. Note: judging from the trend monitor, even though it was replaced with those newly purchased in FY2016, it got degraded.||
||225022 || || ||IY Test Mass oplev (checked by Yamada on 20190719) --> But it was installed at IX!! (checked by Akutsu on 20190719) --> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9855|Detached on 20190807]] and stocked. ||
||228141 || || ||'''Stocked''' (20190730 confirmed) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9855|Installed at ITMX (20190807) ]]||
|| '''--(228142)--''' || || ||Stocked at the field out of the box in the IYA clean booth (20190730 confirmed) -> '''Took it out''' to send back to the company according to our agreement (20200108)||
|| '''--(228143)--''' || || ||Stocked (20190730 confirmed) -> '''Took it out''' to send it back to the company according to our agreement (20200108)||
||228144 || || ||Stocked (20190730); firstly I (Akutsu) happened to find it was left at the entrance of the IXC booth for some reason...  --> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10586|Installed at PRM (20190918)]]||
||228145 || || ||IX Marionette oplev (but Maybe IY MN oplev)-> IXC clean booth(Used for MN oplev) -> IXC area||
||228146 || || ||SR3; degrading. Halved in 7200 hours. ||
||228147 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4319|Installed at MCo (20180301)]]. So far it is ok (20190718). ||
||228148 || || ||IX Test Mass opLev (but may be IY TM oplev); suspect degrading! ||
||228151 || || ||EY Marionette oplev -> EYC clean booth(Used for MN oplev) -> IXC area -> [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19343|Moved from IXC area to EYC TM oplev]]||
||228153 || || ||IY Marionette oplev (but maybe IX MN oplev) -> IYC clean booth(Used for MN oplev) -> IXC area||
|| '''--(228154)--''' || || ||EX Test Mass oplev; suspect degrading! --> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Detached and stocked in the center (20200109)]] ||
||228155 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Installed at MCe (20181212)]]. Not so clear as that of MCi, but this is also getting degraded. ||
||228158 || || ||SRM; degrading. Halved in 7200 hours. ||
||228160 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=7353|Installed at MCi (20181212)]]. Note: judging from the trend monitor, even though it was replaced with those newly purchased in FY2016, it got degraded. ||
Line 50: Line 51:
=== 2019 April ===
Line 51: Line 53:
|| 242770 || || || ||
|| 242771 || || || ||
|| 242772 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8712|Installed at PR3 (20190422)]] ||
||242770 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9758|Installed at IMMT2 (20190801)]] ||
||242771 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9759|Installed at PR2 (20190801)]] ||
||242772 || || ||[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=8712|Installed at PR3 (20190422)]] ||
=== 2019 December ===
The company agreed to provide some new light source for free.
||Serial# ||ICRR asset track# || ||Status ||
||'''--(242767)--''' || (Free exchange)|| ||'''Stocked''' at Mozumi (20191218) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Installed at EY test mass (20200109)]]->[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19314|Moved to IXC]]-> [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19361|Sadly broken by an accident]] ||
||242768 || (Free exchange)|| ||'''Stocked''' at Mozumi (20191218) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Installed at EX test mass (20200109)]] ||
||242769 || (Free exchange)|| ||'''Stocked''' at Mozumi (20191218) -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12440|Installed at EX marionette (20200109)]] -> IXC area -> [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19346|Moved from IXC area to IMMT1 TM oplev]] ||

== FY2021 ==
=== 2022 Jan ===
||Serial# ||ICRR asset track# || ||Status ||
||268205 || Free delivered || ||'''Stocked''' at Mozumi (20220121) ||

Light sources for oplevs

Superlum: SLD-MS-261-MP1-FC/APC-PMF

  • FY2012: 1 pc delivered. (Just for a test)
  • FY2013: 15 pcs delivered.
  • FY2016: 15 pcs delivered.
  • Note: after repaired, it seems the company gave new serial numbers. So the old serial numbers will become unused.
  • 20190411: renewed three are delivered: S/N 242770, 242771, 242772.
  • 20191218: three free-exchanges are delivered: S/N 242767, 242768, 242769.
  • 20220121: one new? light source (S/N 268205) and a repaired one (S/N 203248) arrived.

FY2013

Serial#

ICRR asset track#

Status

203245

IMMT1 (confirmed by Akutsu on 20190801); degrading, halved in 7200 hours. -> Dead on 20220104

203246

PRM (confirmed by Akutsu on 20190801); degrading, halved in 7200 hours. --> Detached (20190918); but it is just halved, so|among these sources it can be still usable??? Anyway it is now stocked tetatively.

203247

Stocked in a box at Xend; had been used for iKAGRA-Xend. (20190731 confirmed) --> Took it out to send back to the company according to our agreement (20200109)

203248

Stocked in a box at Yend; had been used for iKAGRA-Yend. (20190731 confirmed) --> Took it back; to be sent to the manufacture (20210531) --> Repaired one came back (20220121)

203249

SR2; degrading; halved in 4800 hours.

203250

[Detached] MCo (halved at ~8400 hours)-> Detached (20180301) -> Repaired one is delivered (20190411)

203251

[Detached (on 20190801) and replaced] old IMMT2; degrading...

203252

[Detached (on 20190801) and replaced] old PR2; degrading. Halved in 7200 hours.

203253

[Detached] MCi (halved at ~6000 hours) -> Detached (20181212) -> Repaired one is delivered (20190411)

203255

EY Test Mass oplev; suspect degrading. -> Detached and stocked in the center (20200109)

203256

[Detached] MCe (halved at ~4800 hours??) -> Detached (20181212) -> Repaired one is delivered (20190411)

203258

EX Marionette oplev; suspect degrading. -> Detached and stocked in the center (20200109)

203259

BS; degrading. Halved in 10800 hours

203262

Stocked at Mitaka (as of 20190729)

203263

[Detached] old PR3; detached. See here and here

FY2016

Serial#

ICRR asset track#

Status

225022

IY Test Mass oplev (checked by Yamada on 20190719) --> But it was installed at IX!! (checked by Akutsu on 20190719) --> Detached on 20190807 and stocked.

228141

Stocked (20190730 confirmed) -> Installed at ITMX (20190807)

228142

Stocked at the field out of the box in the IYA clean booth (20190730 confirmed) -> Took it out to send back to the company according to our agreement (20200108)

228143

Stocked (20190730 confirmed) -> Took it out to send it back to the company according to our agreement (20200108)

228144

Stocked (20190730); firstly I (Akutsu) happened to find it was left at the entrance of the IXC booth for some reason... --> Installed at PRM (20190918)

228145

IX Marionette oplev (but Maybe IY MN oplev)-> IXC clean booth(Used for MN oplev) -> IXC area

228146

SR3; degrading. Halved in 7200 hours.

228147

Installed at MCo (20180301). So far it is ok (20190718).

228148

IX Test Mass opLev (but may be IY TM oplev); suspect degrading!

228151

EY Marionette oplev -> EYC clean booth(Used for MN oplev) -> IXC area -> Moved from IXC area to EYC TM oplev

228153

IY Marionette oplev (but maybe IX MN oplev) -> IYC clean booth(Used for MN oplev) -> IXC area

228154

EX Test Mass oplev; suspect degrading! --> Detached and stocked in the center (20200109)

228155

Installed at MCe (20181212). Not so clear as that of MCi, but this is also getting degraded.

228158

SRM; degrading. Halved in 7200 hours.

228160

Installed at MCi (20181212). Note: judging from the trend monitor, even though it was replaced with those newly purchased in FY2016, it got degraded.

FY2019

2019 April

Serial#

ICRR asset track#

Status

242770

Installed at IMMT2 (20190801)

242771

Installed at PR2 (20190801)

242772

Installed at PR3 (20190422)

2019 December

The company agreed to provide some new light source for free.

Serial#

ICRR asset track#

Status

242767

(Free exchange)

Stocked at Mozumi (20191218) -> Installed at EY test mass (20200109)->Moved to IXC-> Sadly broken by an accident

242768

(Free exchange)

Stocked at Mozumi (20191218) -> Installed at EX test mass (20200109)

242769

(Free exchange)

Stocked at Mozumi (20191218) -> Installed at EX marionette (20200109) -> IXC area -> Moved from IXC area to IMMT1 TM oplev

FY2021

2022 Jan

Serial#

ICRR asset track#

Status

268205

Free delivered

Stocked at Mozumi (20220121)

KAGRA/Subgroups/AOS/Oplev_Light_Sources (last edited 2022-01-24 19:46:38 by TomotadaAkutsu)