= 20180918 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6185]] == Today's activities == Workers: Akutsu, Uraguchi, Yano at Mitaka * Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny. == Next plan == * Accpet those above. * Bring them to the Xend. * Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend. * Then, somehow connect the cut signal wires of a LVDT. * Check the integirty of the coils (LVDTs and actuators) by testers * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]]. == Wanted! == * Tester!! lend from DGS or PEM?? * First contact to clean the side diameter of the optics.