Line 2: | Line 2: |
* | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6394]] |
Line 6: | Line 6: |
* Delivered an oplev pylon. * Delivered a K400 flange (VN7877 by Mirapro), which had been washed at Mirapro. * Checked the polarity of LVDTs and actuator coils, and compared with the one measured in Mitaka shown [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|here]. |
* Akutsu cleaned each side of the optical parts to be installed into the chamber (on the BRT) just using ethanol only. So I omitted acetone and First Contact... Anyway, they are * CVI's HM-2037-45 * Thorlabs's HBSY21 * Opto Sigma's special one: TFMQSP-50.8C10-20-532/1064-0/26D * Opto Sigma's SLB-50.8-200NM * Need to make a summary page similar to [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1/TMSY1GreenOpticsMemo|here]]. * Started the alignment of the BRT using the green transmitted beam. It is still on the way. * AAAA * BBBB |
Line 11: | Line 17: |
* Connect the cables to flanges. | * Wash an ''imo''-screw for connecting the lens holder and the lower pile. * Align and balance the BRT and the TMS-VIS. |
Line 13: | Line 20: |
* Engage the logical channels and the assigned physical channels. * Install BRT on TMS-VIS. |
|
Line 19: | Line 24: |
* Make clean the cabling... ask to VIS?? |
20181003
Today's activities
Workers: Akutsu, K. Nagano, Aritomi K. Tanaka, Kita
- Akutsu cleaned each side of the optical parts to be installed into the chamber (on the BRT) just using ethanol only. So I omitted acetone and First Contact... Anyway, they are
- CVI's HM-2037-45
- Thorlabs's HBSY21
- Opto Sigma's special one: TFMQSP-50.8C10-20-532/1064-0/26D
- Opto Sigma's SLB-50.8-200NM
Need to make a summary page similar to here.
- Started the alignment of the BRT using the green transmitted beam. It is still on the way.
- AAAA
- BBBB
Next plan
Wash an imo-screw for connecting the lens holder and the lower pile.
- Align and balance the BRT and the TMS-VIS.
- Configure the digital models properly.
Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.
- Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges.
- Torque completely the bolts which are fixing the upper and the lower base plates.
- Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors.
- Check horizontal actuation
- Calibrate LVDT again
- Put calibration factor of Geophones
- Install Tome-Kanagu for Dsub in DAC0 port #4
- Put tags to cables
- Align BRT
- Start to install GPT part
- Damping of TMS-VIS
Wanted!
- Tester!! lend from DGS or PEM??
- M8 eyebolts for managing the dummy weight plates...
- First contact to clean the side diameter of the optics.
- Need a signal generator for LVDTs
- A document for learning how to release or fix the suspended tables (by Uraguchi?).
- Cable tags
- IR mirrors (4 PYD-20, 3 PYD-10)
- Tome-Kanagu for Dsub
- Power taps
- ONE DAC PORT!!!!