⇤ ← Revision 1 as of 2018-10-06 19:24:20
Size: 690
Comment:
|
Size: 760
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
=== BRT part installation === === GPT part installation === |
20181006
- [[]]
Today's activities
Workers: Akutsu, K. Nagano
BRT part installation
GPT part installation
Next plan
- Align and balance the BRT and the TMS-VIS.
- Configure the digital models properly.
- Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges.
- Torque completely the bolts which are fixing the upper and the lower base plates.
- Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors.
- Align BRT
- Start to install GPT part
- Damping of TMS-VIS
Wanted!
- A document for learning how to release or fix the suspended tables (by Uraguchi?).