Line 9: Line 9:
 * Akutsu-san will report
Line 10: Line 12:
 * After BRT part was installed and aligned, we started to install GPT part (in-air part).

20181006

  • [[]]

Today's activities

Workers: Akutsu, K. Nagano

BRT part installation

  • Akutsu-san will report

GPT part installation

  • After BRT part was installed and aligned, we started to install GPT part (in-air part).

Next plan

  • Align and balance the BRT and the TMS-VIS.
  • Configure the digital models properly.
  • Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges.
  • Torque completely the bolts which are fixing the upper and the lower base plates.
  • Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors.
  • Align BRT
  • Start to install GPT part
  • Damping of TMS-VIS

Wanted!

  • A document for learning how to release or fix the suspended tables (by Uraguchi?).