Differences between revisions 3 and 4
Revision 3 as of 2018-10-08 18:03:52
Size: 879
Editor: KojiNagano
Comment:
Revision 4 as of 2018-10-08 18:04:07
Size: 895
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 * Now writing

20181006

  • [[]]

Today's activities

Workers: Akutsu, K. Nagano

BRT part installation

  • Akutsu-san will report

GPT part installation

  • After BRT part was installed and aligned, we started to install GPT part (in-air part).
  • Now writing

Next plan

  • Align and balance the BRT and the TMS-VIS.
  • Configure the digital models properly.
  • Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges.
  • Torque completely the bolts which are fixing the upper and the lower base plates.
  • Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors.
  • Align BRT
  • Start to install GPT part
  • Damping of TMS-VIS

Wanted!

  • A document for learning how to release or fix the suspended tables (by Uraguchi?).

KAGRA/Subgroups/AOS/TMSX_O3/2018-10-06 (last edited 2018-10-10 10:22:41 by TomotadaAkutsu)