= 20181006 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6452]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6455]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6458]] == Today's activities == Workers: Akutsu, K. Nagano === BRT part installation === * See [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6455|here]] === GPT part installation === * We brought five QPD mechanical basis with plastic case which was used to store Dsub cables. * AFTER QPD INSTALLATION, WE SHOULD RETURN THE BOX TO 低音鏡機械室. * After BRT part was installed and aligned, we started to install GPT part (in-air part). * We found that damping of TMS-VIS was not necessary for GPT installation. * Following the [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|design]], we installed the beginning part of the green light path, two periscope mirrors, two steering mirrors, and one lenses. * First periscope mirror (GPM1): TFM-50C080532 (Opto-Sigma) {{attachment:GPM1.jpg|GPM1|width="400" }} * Second periscope mirror (GPM2): TFM-50C080532 (Opto-Sigma) {{attachment:GPM2.jpg|GPM2|width="400" }} * First steering mirror (GST1): TFM-50C080532 (Opto-Sigma) {{attachment:GST1.jpg|GST1|width="400" }} * Second steering mirror (GST2): TFM-50C080532 (Opto-Sigma) {{attachment:GST2.jpg|GST2|width="400" }} * First lens (GLNS1, f=500): LA1380-A-ML (Thorlabs) {{attachment:GLNS1.jpg|GLNS1|width="400" }} * At first, all mirrors were installed. Then the lens was installed not to change beam position. * The lens position, i.e. beam profile, was not tuned since the tuning was not so effective without arm cavity locked. * In the end of today's work, we installed DC PD (PDA100A2, Thorlabs) after GST2 temporarily. The gain was set to 0 dB. {{attachment:GPD_gain.jpg|GPD|width="400" }} * After all, GPT part looks like below. {{attachment:Overview.jpg|overview|width="400" }} * The signal was checked like [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6452|this]]. * Enomoto-kun kindly built model (k1aostmsx) and restarted k1dc0 to register channel for IR and Green DC PD befor the above klog6452. == Next plan == * Align and balance the BRT and the TMS-VIS. * Configure the digital models properly. * Detach the remaining white tapes just before closing the chamber; be noted that there are white tapes on the PEEK connectors at the inside of the flanges. * Torque completely the bolts which are fixing the upper and the lower base plates. * Insert metal gaskets before torquing the ICF203 flanges with Dsub connectors. * Install optics after GBS1 * Install gigE camera * Modify MEDM screen * Add DC PD and so on. * Cable Dsub 15pin for TMS-VIS OpLev. * Modify cabling for DC PD. * Return plastic box. * Install rails in digital rack. * They may be necessary under LVDT distributor, geophone distributor, and WHT board. * Nagano is not sure it is necessary under HP coil driver. * Consider how to cable Dsub cables to QPD. == Wanted! == * A document for learning how to release or fix the suspended tables (by Uraguchi?). * FIVE QPD electronics boards