Differences between revisions 3 and 4
Revision 3 as of 2018-10-09 22:29:14
Size: 875
Comment:
Revision 4 as of 2018-10-09 22:29:35
Size: 875
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 20181006 = = 20181009 =

20181009

Today's activities

Workers: Akutsu, Michimura, K. Tanaka

GPT part installation

  • Installed optics for green path from GBS1, except for green QPD boards (See JGW-T1808962 for optical layout)

    • we marked screw holes on optical table every 10 holes
    • the position of GST2 was 25mm too far from GLNS1, so we moved it to the default position
  • Other things
    • Height of Gig-E camera is a bit short
    • LVDT

Next Plan

  • Install QPD boards and do the final cabling
  • Check why Gig-E camera is not working

Wanted!

  • M4-12mm (or longer) screws instead of M4-10mm for fixing mirror holders to 20mm dia. posts
  • Spacer for Gig-E camera (height is shorter than 4-inch right now)

KAGRA/Subgroups/AOS/TMSX_O3/2018-10-09 (last edited 2018-10-10 11:10:28 by TomotadaAkutsu)