20181009
Today's activities
Workers: Akutsu, Michimura, K. Tanaka (17:30-21:30)
GPT part installation
Installed optics for green path from GBS1, except for green QPD boards (See JGW-T1808962 for optical layout)
- we marked screw holes on optical table every 10 holes
- we labeled all the mirror mounts with the part number of the optic
- the position of GST2 was 25mm too far from GLNS1, so we moved it to the default position
- beam seems to be focused at around GST3, as expected
- Other things
- Height of Gig-E camera is a bit short
- All the LVDT outputs went close to zero from around 21:26. We didn't notice this until we got back to the control room.
Next Plan
- Investigate LVDT outputs
- Install QPD boards and do the final cabling
- Check why Gig-E camera is not working
- Install IR optics
Wanted!
- M4-12mm (or longer) screws instead of M4-10mm for fixing mirror holders to 20mm dia. posts
- Spacer for Gig-E camera (height is shorter than 4-inch right now)