Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2018-09-18 21:57:21
Size: 1738
Comment:
Revision 7 as of 2018-12-11 22:07:06
Size: 1875
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * With a fixed stage.  * With a vibration isolation stage (VIS).
Line 4: Line 4:
||<<MonthCalendar(,2018,9)>>||<<MonthCalendar(,2018,10)>>|| ||<<MonthCalendar(,2018,9)>>||<<MonthCalendar(,2018,10)>>||<<MonthCalendar(,2018,11)>>||<<MonthCalendar(,2018,12)>>||
Line 18: Line 18:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation]]  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6652]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6454]]
Line 24: Line 26:
 * Place/install the fixed stage.
  * Needs some shims... but what is the required horizontalness?
 * Place/install the BRT
  * What is the references...?
 * Place/install the TMS-VIS (TMS's vibration isolation stage).
 * Place/install the BRT on the TMS-VIS

Transmission Monitor (TMS) at EXT (For O3)

  • With a vibration isolation stage (VIS).
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2018 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    

<< <  2018 / 12 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the TMS-VIS (TMS's vibration isolation stage).
  • Place/install the BRT on the TMS-VIS

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/Subgroups/AOS/TMSX_O3 (last edited 2019-05-27 18:59:48 by TomotadaAkutsu)