Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2018-09-18 21:58:35
Size: 1695
Comment:
Revision 5 as of 2018-10-22 13:32:35
Size: 1766
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * With a fixed stage.  * With a vibration isolation stage (VIS).
Line 19: Line 19:
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6652]]

Transmission Monitor (TMS) at EXT (For O3)

  • With a vibration isolation stage (VIS).
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 9 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2018 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the TMS-VIS (TMS's vibration isolation stage).
  • Place/install the BRT on the TMS-VIS

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/Subgroups/AOS/TMSX_O3 (last edited 2019-05-27 18:59:48 by TomotadaAkutsu)