20190604

Today's activities

Workers (AM): Akutsu, Uraguchi, K. Tanaka, Furuta, Kamioka-Kougyou, Hayakawa, Nakada, Tamori Workers (PM): Akutsu, Uraguchi, K. Tanaka, Nakada, Tamori

Next Plan

  • Check the brought load.
  • Attach the geophones
  • Check the electric connections.

Wanted!

  • 1t chain block for the portal crane to pick up the load from the palette.
  • Slings and Shuckles for picking up the load from the palette.
  • (Blue) levelers.
  • Laser level at Xend.