Size: 568
Comment:
|
Size: 833
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9083]] | |
Line 5: | Line 6: |
Workers (AM): Akutsu, Uraguchi, K. Tanaka, Furuta, Kamioka-Kougyou, Hayakawa, Nakada, Tamori Workers (PM): Akutsu, Uraguchi, K. Tanaka, Nakada, Tamori |
* Workers (AM): Akutsu, Uraguchi, K. Tanaka, Furuta, Kamioka-Kougyou, Hayakawa, Nakada, Tamori * Workers (PM): Akutsu, Uraguchi, K. Tanaka, Nakada, Tamori |
Line 8: | Line 9: |
* | * This morning we accepted the TMS-VIS-Y and the accompanying parts (see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9082|here]]). * This afternoon we took out the BRT-Y from the EXT chamber with the fixed table. |
20190604
Today's activities
- Workers (AM): Akutsu, Uraguchi, K. Tanaka, Furuta, Kamioka-Kougyou, Hayakawa, Nakada, Tamori
- Workers (PM): Akutsu, Uraguchi, K. Tanaka, Nakada, Tamori
This morning we accepted the TMS-VIS-Y and the accompanying parts (see here).
- This afternoon we took out the BRT-Y from the EXT chamber with the fixed table.
Next Plan
- Check the brought load.
- Attach the geophones
- Check the electric connections.
Wanted!
- 1t chain block for the portal crane to pick up the load from the palette.
- Slings and Shuckles for picking up the load from the palette.
- (Blue) levelers.
- Laser level at Xend.