Size: 703
Comment:
|
Size: 833
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=9083]] | |
Line 9: | Line 10: |
* | * This afternoon we took out the BRT-Y from the EXT chamber with the fixed table. |
20190604
Today's activities
- Workers (AM): Akutsu, Uraguchi, K. Tanaka, Furuta, Kamioka-Kougyou, Hayakawa, Nakada, Tamori
- Workers (PM): Akutsu, Uraguchi, K. Tanaka, Nakada, Tamori
This morning we accepted the TMS-VIS-Y and the accompanying parts (see here).
- This afternoon we took out the BRT-Y from the EXT chamber with the fixed table.
Next Plan
- Check the brought load.
- Attach the geophones
- Check the electric connections.
Wanted!
- 1t chain block for the portal crane to pick up the load from the palette.
- Slings and Shuckles for picking up the load from the palette.
- (Blue) levelers.
- Laser level at Xend.