Line 20: Line 20:
 * --(Place/install the WAB suspension)--
 * --(
Align the position of WAB -> take WAB back to nominal position, put off protectors))--
  * --(
horizontal alignment)--
  * --(
yaw alignment)--
 * --(
Move it to the saving mode.)--
 * --(
Back to the nominal position.)--
 * --(Attach heat links)--
  * --(
4 soft heat links to WAB)--
  * --(
1 heat link btwn the top and the structure)--
 * --(
Attach 2 thermometers)--
 * Place/install the WAB suspension
 *
Align the position of WAB -> take WAB back to nominal position, put off protectors)
  *
horizontal alignment
  *
yaw alignment
 *
Move it to the saving mode.
 *
Back to the nominal position.
 * Attach heat links
  *
4 soft heat links to WAB
  *
1 heat link btwn the top and the structure
 *
Attach 2 thermometers
Line 35: Line 35:
||A||75 ohm|| Thermometer S/N#2564|| V- || Green || WAB || ||
||B||75 ohm|| Thermometer S/N#2564|| V+ || Black || WAB || ||
||C||4 ohm|| Thermometer S/N#2564|| I- || Red || WAB || ||
||D||4 ohm|| Thermometer S/N#2564|| I+ || Yellow || WAB || ||
||E||75 ohm|| Thermometer S/N#360|| V- || Green || Structure || ||
||F||75 ohm|| Thermometer S/N#360|| V+ || Black || Structure || ||
||G||4 ohm|| Thermometer S/N#360|| I- || Red || Structure || ||
||H||4 ohm|| Thermometer S/N#360|| I+ || Yellow || Structure || ||

Wide Angle Baffle at EXC

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension
  • Align the position of WAB -> take WAB back to nominal position, put off protectors)

    • horizontal alignment
    • yaw alignment
  • Move it to the saving mode.
  • Back to the nominal position.
  • Attach heat links
    • 4 soft heat links to WAB
    • 1 heat link btwn the top and the structure
  • Attach 2 thermometers
  • Set revised blocks under the base plate.

Pin Assignment

P23, to be connected to Cryocon#7 E and F in this order respectively.

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

Note that the pin arrangement (or the naming) is mirrored compared with that of in IXC! Rather, I guess this IXC's would be correct.

KAGRA/Subgroups/AOS/WideAngleBaffleEX (last edited 2020-11-10 21:23:25 by TomotadaAkutsu)