Line 21: Line 21:
 * --(Align the position of WAB -> take WAB back to nominal position, put off protectors))--  * --(Align the position of WAB)--
Line 25: Line 25:
 * --(Back to the nominal position.)--
 * --(Attach heat links)--
  * --(4 soft heat links to WAB)--
  * --(1 heat link btwn the top and the structure)--
 * --(Attach 2 thermometers)--
 * Back to the nominal position.
 * Attach heat links
  * 4 soft heat links to WAB
  * 1 heat link btwn the top and the structure
 * Attach 2 thermometers
Line 35: Line 35:
||A||75 ohm|| Thermometer S/N#2564|| V- || Green || WAB || ||
||B||75 ohm|| Thermometer S/N#2564|| V+ || Black || WAB || ||
||C||4 ohm|| Thermometer S/N#2564|| I- || Red || WAB || ||
||D||4 ohm|| Thermometer S/N#2564|| I+ || Yellow || WAB || ||
||E||75 ohm|| Thermometer S/N#360|| V- || Green || Structure || ||
||F||75 ohm|| Thermometer S/N#360|| V+ || Black || Structure || ||
||G||4 ohm|| Thermometer S/N#360|| I- || Red || Structure || ||
||H||4 ohm|| Thermometer S/N#360|| I+ || Yellow || Structure || ||

Wide Angle Baffle at EXC

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB

    • horizontal alignment

    • yaw alignment

  • Move it to the saving mode.

  • Back to the nominal position.
  • Attach heat links
    • 4 soft heat links to WAB
    • 1 heat link btwn the top and the structure
  • Attach 2 thermometers
  • Set revised blocks under the base plate.

Pin Assignment

P23, to be connected to Cryocon#7 E and F in this order respectively.

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

Note that the pin arrangement (or the naming) is mirrored compared with that of in IXC! Rather, I guess this IXC's would be correct.

KAGRA/Subgroups/AOS/WideAngleBaffleEX (last edited 2020-11-10 21:23:25 by TomotadaAkutsu)