Differences between revisions 4 and 5
Revision 4 as of 2019-01-17 16:50:28
Size: 2064
Comment:
Revision 5 as of 2020-11-10 21:23:25
Size: 2105
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
||<<MonthCalendar(,2020,11)>>|| || ||

Wide Angle Baffle at EXC

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

<< <  2020 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB

    • horizontal alignment

    • yaw alignment

  • Move it to the saving mode.

  • Back to the nominal position.
  • Attach heat links
    • 4 soft heat links to WAB
    • 1 heat link btwn the top and the structure
  • Attach 2 thermometers
  • Set revised blocks under the base plate.

Pin Assignment

P23, to be connected to Cryocon#7 E and F in this order respectively.

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

Note that the pin arrangement (or the naming) is mirrored compared with that of in IXC! Rather, I guess this IXC's would be correct.