Differences between revisions 2 and 3
Revision 2 as of 2019-02-24 21:53:16
Size: 223
Editor: YukiInoue
Comment:
Revision 3 as of 2019-02-25 18:26:01
Size: 1502
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:

-----
=== Realtime model for DRMI commissioning ===
 * Requests from commissioning team
   * Calibrated signals of MICH, PRCL, and SRCL.
   * 10-20% error for each DOF
   * ASAP after DRMI will be locked.
 * Current status of RT model.
   * Filter processes of MICH, PRCL, and SRCL are constructed.
     * dL = C^-1^ * v,,e,, + (A,,TM,, + A,,IM,,) * v,,c,,
   || '''variable''' || '''channel name''' ||
   || dL || K1:CAL-CS_PROC_$(DOF)_DISPLACEMENT ||
   || C^-1^ * v,,e,, || K1:CAL-CS_PROC_$(DOF)_RESIDULA ||
   || (A,,TM,, + A,,IM,,) * v,,c,, || K1:CAL-CS_PROC_$(DOF)_DELTA_CTRL ||
   || v,,e,, || K1:CAL-CS_PROC_$(DOF)_ERR ||
   || v,,c,, || K1:CAL-CS_PROC_$(DOF)_CTRL ||
   * Channels are not registered to DAQ yet.
   * There are no CAL line to PRM and SRM.
     * Is there any plan of low-latency/offline reconstruction? -> Darkhan and Sawada-san.
   * Gain drifts by time are not taken into account.
 * What we need.
   * Optical gain (and cav. pole of PRC and SRC).
   * Actuator efficiencies of TM and IM of BS, PRM, and SRM.
     * Maybe the approximations as f^-2^ and f^-4^ are enough for 10-20% error.

2019/02/25 18:30

Agenda

  • Schedule: Yuki
  • Realtime model for DRMI commissioning: Yamammmoto
  • Pcal finalization (Y-end result): Yuki
  • Progress of measurement for DARM model: Cory
  • CAL-Git: Wu-Cheng


Realtime model for DRMI commissioning

  • Requests from commissioning team
    • Calibrated signals of MICH, PRCL, and SRCL.
    • 10-20% error for each DOF
    • ASAP after DRMI will be locked.
  • Current status of RT model.
    • Filter processes of MICH, PRCL, and SRCL are constructed.
      • dL = C-1 * ve + (ATM + AIM) * vc

      variable

      channel name

      dL

      K1:CAL-CS_PROC_$(DOF)_DISPLACEMENT

      C-1 * ve

      K1:CAL-CS_PROC_$(DOF)_RESIDULA

      (ATM + AIM) * vc

      K1:CAL-CS_PROC_$(DOF)_DELTA_CTRL

      ve

      K1:CAL-CS_PROC_$(DOF)_ERR

      vc

      K1:CAL-CS_PROC_$(DOF)_CTRL

    • Channels are not registered to DAQ yet.
    • There are no CAL line to PRM and SRM.
      • Is there any plan of low-latency/offline reconstruction? -> Darkhan and Sawada-san.

    • Gain drifts by time are not taken into account.
  • What we need.
    • Optical gain (and cav. pole of PRC and SRC).
    • Actuator efficiencies of TM and IM of BS, PRM, and SRM.
      • Maybe the approximations as f-2 and f-4 are enough for 10-20% error.

KAGRA/Subgroups/CAL/CAL_Meeting/20180225 (last edited 2019-02-26 08:53:19 by yu-kuang.chu)