Size: 1660
Comment:
|
← Revision 5 as of 2019-02-26 08:53:19 ⇥
Size: 1749
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* Progress of measurement for DARM model: Cory | * Progress of measurement for DARM model: Cory [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9865|slide]] |
2019/02/25 18:30
Agenda
- Schedule: Yuki
- Realtime model for DRMI commissioning: Yamammmoto
- Pcal finalization (Y-end result): Yuki
Progress of measurement for DARM model: Cory slide
CAL-Git: Wu-Cheng slide
Realtime model for DRMI commissioning
- Requests from commissioning team
- Calibrated signals of MICH, PRCL, and SRCL.
- 10-20% error for each DOF
- ASAP after DRMI will be locked.
- Current status of RT model.
- Filter processes of MICH, PRCL, and SRCL are constructed.
dL = C-1 * ve + (ATM + AIM) * vc
variable
channel name
dL
K1:CAL-CS_PROC_$(DOF)_DISPLACEMENT
C-1 * ve
K1:CAL-CS_PROC_$(DOF)_RESIDULA
(ATM + AIM) * vc
K1:CAL-CS_PROC_$(DOF)_DELTA_CTRL
ve
K1:CAL-CS_PROC_$(DOF)_ERR
vc
K1:CAL-CS_PROC_$(DOF)_CTRL
- Channels are not registered to DAQ yet.
- There are no CAL line to PRM and SRM.
Is there any plan of low-latency/offline reconstruction? -> Darkhan and Sawada-san.
- Gain drifts by time are not taken into account.
- Filter processes of MICH, PRCL, and SRCL are constructed.
- What we need.
- Optical gain (and cav. pole of PRC and SRC).
- Actuator efficiencies of TM and IM of BS, PRM, and SRM.
Maybe the approximations as f-2 and f-4 are enough for 10-20% error.