2019/02/25 18:30

Agenda

  • Schedule: Yuki
  • Realtime model for DRMI commissioning: Yamammmoto
  • Pcal finalization (Y-end result): Yuki
  • Progress of measurement for DARM model: Cory slide

  • CAL-Git: Wu-Cheng slide


Realtime model for DRMI commissioning

  • Requests from commissioning team
    • Calibrated signals of MICH, PRCL, and SRCL.
    • 10-20% error for each DOF
    • ASAP after DRMI will be locked.
  • Current status of RT model.
    • Filter processes of MICH, PRCL, and SRCL are constructed.
      • dL = C-1 * ve + (ATM + AIM) * vc

      variable

      channel name

      dL

      K1:CAL-CS_PROC_$(DOF)_DISPLACEMENT

      C-1 * ve

      K1:CAL-CS_PROC_$(DOF)_RESIDULA

      (ATM + AIM) * vc

      K1:CAL-CS_PROC_$(DOF)_DELTA_CTRL

      ve

      K1:CAL-CS_PROC_$(DOF)_ERR

      vc

      K1:CAL-CS_PROC_$(DOF)_CTRL

    • Channels are not registered to DAQ yet.
    • There are no CAL line to PRM and SRM.
      • Is there any plan of low-latency/offline reconstruction? -> Darkhan and Sawada-san.

    • Gain drifts by time are not taken into account.
  • What we need.
    • Optical gain (and cav. pole of PRC and SRC).
    • Actuator efficiencies of TM and IM of BS, PRM, and SRM.
      • Maybe the approximations as f-2 and f-4 are enough for 10-20% error.