Size: 92
Comment:
|
Size: 360
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== * Schedule 10min Yuki Inoue * Review of Gravity field calibrator 15min (Yuki Inoue) |
= 2018/07/05 = == Agenda == * Yuki: Schedule * Takayuki: Debugging of Y-end Pcal 15min * Chihiro: Summary of integration test 30 min * Darkhan: Make gstlal-calibration running on a machine at KAGRA 15 min * Yuki: Short review of Gravity field calibrator (run03) 10min * Cory: Result of injection test with De-whitening filter 30min == Memo == |
2018/07/05
Agenda
- Yuki: Schedule
- Takayuki: Debugging of Y-end Pcal 15min
- Chihiro: Summary of integration test 30 min
- Darkhan: Make gstlal-calibration running on a machine at KAGRA 15 min
- Yuki: Short review of Gravity field calibrator (run03) 10min
- Cory: Result of injection test with De-whitening filter 30min