Line 5: | Line 5: |
* Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min) * Cory: Plans of injection test with X-end Pcal (10min) |
|
Line 6: | Line 8: |
* Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min) * Sadakazu, Takaaki or Cory: Plans of injection test with X-end Pcal (10min) |
2018/07/30 18:00
Agenda
- Yuki: Schedule and Plan (15min)
- Takahiro: Summary of Software meeting (15min)
- Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min)
- Cory: Plans of injection test with X-end Pcal (10min)
- Chihiro: Instllation of X-end Pcal and Performance (15 min)