Differences between revisions 1 and 2
Revision 1 as of 2018-07-26 14:55:12
Size: 350
Editor: YukiInoue
Comment:
Revision 2 as of 2018-07-30 17:56:36
Size: 329
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
 * Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min)
 * Cory: Plans of injection test with X-end Pcal (10min)
Line 6: Line 8:
 * Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min)
 * Sadakazu, Takaaki or Cory: Plans of injection test with X-end Pcal (10min)

2018/07/30 18:00

Agenda

  • Yuki: Schedule and Plan (15min)
  • Takahiro: Summary of Software meeting (15min)
  • Darkhan: Gstlal-calibration running on a machine at KAGRA (15 min)
  • Cory: Plans of injection test with X-end Pcal (10min)
  • Chihiro: Instllation of X-end Pcal and Performance (15 min)

Memo

KAGRA/Subgroups/CAL/CAL_Meeting/20180730 (last edited 2018-07-30 17:56:36 by YukiInoue)