Differences between revisions 3 and 19 (spanning 16 versions)
Revision 3 as of 2018-07-30 20:06:58
Size: 340
Editor: YukiInoue
Comment:
Revision 19 as of 2018-08-26 11:14:07
Size: 575
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Takahiro: Summary of Software meeting (15min)
 * Cory: Injection test and Story of Master thesis (10min)
 * Yokozawa: Review of Tcam paper(20min)
 * Yuki: Review of Gcal(10min)
   * Schedule
   * F2F meeting
    * Speaker1:Overview(Yamamoto;10min)
    * Speaker2:Reconstruction (Plan and current status of Ver.1 test) (Sawada;10min)
    * Speaker3:X-end Pcal (Kozakai;10min)
 * Cory: Injection test and Story of Master thesis (20min)
 * Takaaki: Review of Tcam paper(20min)
 * Takahiro: Plans of development of ver.1 reconstruction pipline (10min)slide
 * Yuki: Review of Gcal (10min)Gcal
Line 9: Line 14:

2018/08/13 18:00

Agenda

  • Yuki: Schedule and Plan (15min)
    • Schedule
    • F2F meeting
      • Speaker1:Overview(Yamamoto;10min)
      • Speaker2:Reconstruction (Plan and current status of Ver.1 test) (Sawada;10min)
      • Speaker3:X-end Pcal (Kozakai;10min)
  • Cory: Injection test and Story of Master thesis (20min)
  • Takaaki: Review of Tcam paper(20min)
  • Takahiro: Plans of development of ver.1 reconstruction pipline (10min)slide
  • Yuki: Review of Gcal (10min)Gcal
  • Chihiro: Summary of early charactarization of X-end Pcal (15 min)

Memo

KAGRA/Subgroups/CAL/CAL_Meeting/20180813 (last edited 2018-08-26 11:14:07 by YukiInoue)