Line 3: Line 3:
*Yuki: 1 month Schedule(10min)
*Yuki: Plan of cal verification test (5min)
*Chihiro: Shift (5min)
*Takaaki: Summary of Commissioning (5min)
*Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
*Chihiro: Plan and basic design of PCB development in Taiwan(15min)
*Wataru: TF measurement in X-end (10min)
*Cory: Discussion of the plots in master thesis(20min)
*Takayuki:Gcal safety (10min)
* Yuki: 1 month Schedule(10min)
* Yuki: Plan of cal verification test (5min)
* Chihiro: Shift (5min)
* Takaaki: Summary of Commissioning (5min)
* Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
* Chihiro: Plan and basic design of PCB development in Taiwan(15min)
* Wataru: TF measurement in X-end (10min)
* Cory: Discussion of the plots in master thesis(20min)
* Takayuki:Gcal safety (10min)

2018/10/22 18:00

Agenda

* Yuki: 1 month Schedule(10min) * Yuki: Plan of cal verification test (5min) * Chihiro: Shift (5min) * Takaaki: Summary of Commissioning (5min) * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min) * Chihiro: Plan and basic design of PCB development in Taiwan(15min) * Wataru: TF measurement in X-end (10min) * Cory: Discussion of the plots in master thesis(20min) * Takayuki:Gcal safety (10min)

MEMO