Differences between revisions 2 and 3
Revision 2 as of 2018-10-22 16:41:07
Size: 474
Editor: YukiInoue
Comment:
Revision 3 as of 2018-10-22 16:41:24
Size: 483
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
* Yuki: 1 month Schedule(10min)
* Yuki: Plan of cal verification test (5min)
* Chihiro: Shift (5min)
* Takaaki: Summary of Commissioning (5min)
* Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
* Chihiro: Plan and basic design of PCB development in Taiwan(15min)
* Wataru: TF measurement in X-end (10min)
* Cory: Discussion of the plots in master thesis(20min)
* Takayuki:Gcal safety (10min)
 * Yuki: 1 month Schedule(10min)
 * Yuki: Plan of cal verification test (5min)
 * Chihiro: Shift (5min)
 * Takaaki: Summary of Commissioning (5min)
 * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
 * Chihiro: Plan and basic design of PCB development in Taiwan(15min)
 * Wataru: TF measurement in X-end (10min)
 * Cory: Discussion of the plots in master thesis(20min)
 * Takayuki:Gcal safety (10min)

2018/10/22 18:00

Agenda

  • Yuki: 1 month Schedule(10min)
  • Yuki: Plan of cal verification test (5min)
  • Chihiro: Shift (5min)
  • Takaaki: Summary of Commissioning (5min)
  • Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
  • Chihiro: Plan and basic design of PCB development in Taiwan(15min)
  • Wataru: TF measurement in X-end (10min)
  • Cory: Discussion of the plots in master thesis(20min)
  • Takayuki:Gcal safety (10min)

MEMO

KAGRA/Subgroups/CAL/CAL_Meeting/20181022 (last edited 2018-10-22 18:19:20 by TakahiroYamamoto)