* Yuki: 1 month Schedule(10min) * Yuki: Plan of cal verification test (5min) * Chihiro: Shift (5min) * Takaaki: Summary of Commissioning (5min) * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min) * Chihiro: Plan and basic design of PCB development in Taiwan(15min) * Wataru: TF measurement in X-end (10min) * Cory: Discussion of the plots in master thesis(20min) * Takayuki:Gcal safety (10min) |
* Yuki: 1 month Schedule(10min) * Yuki: Plan of cal verification test (5min) * Chihiro: Shift (5min) * Takaaki: Summary of Commissioning (5min) * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min) * Chihiro: Plan and basic design of PCB development in Taiwan(15min) * Wataru: TF measurement in X-end (10min) * Cory: Discussion of the plots in master thesis(20min) * Takayuki:Gcal safety (10min) |
2018/10/22 18:00
Agenda
- Yuki: 1 month Schedule(10min)
- Yuki: Plan of cal verification test (5min)
- Chihiro: Shift (5min)
- Takaaki: Summary of Commissioning (5min)
- Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)
- Chihiro: Plan and basic design of PCB development in Taiwan(15min)
- Wataru: TF measurement in X-end (10min)
- Cory: Discussion of the plots in master thesis(20min)
Takayuki:Gcal safety (10min)