Differences between revisions 3 and 4
Revision 3 as of 2018-10-22 16:41:24
Size: 483
Editor: YukiInoue
Comment:
Revision 4 as of 2018-10-22 18:19:20
Size: 576
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min)  * Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min) [ [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9195|slide]] ]

2018/10/22 18:00

Agenda

  • Yuki: 1 month Schedule(10min)
  • Yuki: Plan of cal verification test (5min)
  • Chihiro: Shift (5min)
  • Takaaki: Summary of Commissioning (5min)
  • Y.Takahiro: Software (Based on new Uchyama-san’s schedule; 15min) [ slide ]

  • Chihiro: Plan and basic design of PCB development in Taiwan(15min)
  • Wataru: TF measurement in X-end (10min)
  • Cory: Discussion of the plots in master thesis(20min)
  • Takayuki:Gcal safety (10min)

MEMO

KAGRA/Subgroups/CAL/CAL_Meeting/20181022 (last edited 2018-10-22 18:19:20 by TakahiroYamamoto)